Precision builds deserve a supply chain that never drops the ball.

In aerospace, a missed delivery is a program slip. Silkline gives aviation and aerospace manufacturers complete visibility over long-lead procurement, automated compliance documentation, and supplier accountability that holds through the entire build cycle.

Oops!
Something went wrong while submitting.

The Challenge

Why is aerospace procurement so hard to manage?

A forging ordered a week late doesn't cost you a week. It costs you a program slip. Aerospace procurement runs on year-long lead times, expiring certifications, and tolerances most software has never had to respect — and a single miss ripples through the entire build.

Long-lead items hide their slip until it's terminal

Forgings and machined structures carry 40-to-52-week lead times. You order at program kickoff and track for a year. Miss the early signal that one is drifting, and there's no recovery window left — only a new schedule.

Compliance paperwork scales faster than your team

AS9100, FAR/DFARS, first article, certificates of conformance — every part, every supplier, every revision. Managed by hand across dozens of vendors, it's not a question of whether something slips through. Only what, and whether the auditor finds it first.

Visibility evaporates below Tier 1

You can see your primes. The sub-tiers your build actually depends on go dark. By the time a Tier 2 problem reaches you, it's already a program risk with a deadline attached.

One engineering change can quietly invalidate an open PO

A revision changes the part. The PO doesn't know. Without a connected system, procurement learns about design changes through hallway conversations — and parts show up built to a rev that no longer flies.

What Goes Wrong

Where aerospace procurement teams lose control.

None of these look like failures while they're happening. They look like normal Tuesdays — right up until the schedule moves.

1. The tracker is a spreadsheet, and the spreadsheet is one person

Long-lead status lives in a workbook only one person updates and only one person fully understands. They take a week off, and the program's single source of truth walks out with them.

2. The compliance package gets built at audit time

The procurement happens; the paperwork waits. Then DCMA schedules a review and a week vanishes into reconstructing certs and representations that should have been captured on day one.

3. Suppliers only hear from you when something's already wrong

There's no rhythm of proactive check-ins, so the first sign of a slip is the slip itself — surfaced too late to absorb, early enough to wreck the quarter.

4. Controlled drawings go out as email attachments

Sensitive CAD and technical data leaves in an inbox with no access control and no audit trail. On an ITAR program, that isn't sloppy. It's an export-control exposure that compounds with every send.

Why Silkline

How does Silkline help aerospace manufacturers stay on schedule and audit-ready?

One system for every order, every document, and every supplier conversation — so the program stays ahead of its own deadlines.

See the slip months before it lands

Every open order and long-lead item is tracked live against its need date. When a supplier goes quiet, Silkline says so — while you still have the runway to do something about it.

Compliance captured in the workflow, not after it

FAR/DFARS documentation and AS9100 workflows are part of how an order moves, not a scramble before the audit. When the auditor asks, the file already exists.

Send controlled data through a controlled channel

Share drawings and part files with access controls and a complete audit trail. For ITAR programs, data lives in a US Gov Cloud environment — not someone's sent folder.

Make every supplier earn the next PO

On-time delivery, responsiveness, and quality, scored automatically. Your best suppliers become obvious. Your risky ones get a conversation backed by data, not a hunch.

“Everyone’s looking at the same information from the start.”
Ricky Davis
Senior Supply Chain Manager

Your program timeline is too important to trust to a spreadsheet.